REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA extends registration of an Andheri commercial project to July 2026
Regulatory Case No. 37 of 2023 extended registration of an Oshiwara-Andheri commercial project from 1 August 2023 to 31 July 2026, subject to completion and reporting conditions.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA extends project registration to July 2024
Regulatory Case No. 63 of 2023 extended the project, project a registered project, from 31 July 2023 to 31 July 2024 subject to completion and occupation-certificate conditions
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal remands refund appeals over Adjudicating Officer jurisdiction
In two connected appeals, the Maharashtra appellate tribunal held that refund and related relief had been decided outside the Adjudicating Officer's proper jurisdiction and remitted the complaints...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA grants project extension after funding delays with completion conditions
In Regulatory Case No. 28 of 2023, MahaRERA allowed a residential project extension after the promoter cited funding constraints, while requiring completion work, occupation-certificate progress an...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA extends delayed project to March 2024 under Section 7(3)
In Regulatory Case No. 27 of 2023, MahaRERA extended a delayed project's registration to 31 March 2024 under Section 7(3), requiring completion and an occupation certificate by the extended date
MahaRERA Order 4681/2023: agent QR-code advertising summary
The source identifies MahaRERA Order No. 4681/2023 as a direction concerning registered real-estate agents and project QR codes in promotions and advertisements.
MahaRERA extends project registration to September 2024 with monitoring conditions
In Regulatory Case No. 26 of 2023, MahaRERA extended the project registration to 30 September 2024 and imposed milestone, monthly-progress and occupancy-certificate reporting conditions
MAHARERA: Who Needs to Register? and why?
Discover the significance of MAHARERA registration and its requirements. Uncover why real estate stakeholders must register under MAHARERA for a transparent property market. Get expert insights now...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA publishes Section 7 notice list for 563 projects
MahaRERA published a 2023 list of 563 projects served notices under Section 7 of the RERA Act
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra tribunal transfers statutory pre-deposit to MahaRERA for execution
After an appeal had been dismissed, the Maharashtra appellate tribunal directed that the available Section 43(5) pre-deposit, with accrued interest, be transferred to MahaRERA so it could be adjust...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal allows additional documents in payment dispute
The Maharashtra Real Estate Appellate Tribunal allowed a developer to place additional payment-related documents on record, holding that strict CPC requirements were not controlling and that natura...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal dismisses review seeking interest and agreement clarifications
In Review Application No. 63 of 2022, the Maharashtra appellate tribunal held that issues concerning the interest rate and a proposed supplementary agreement had already been addressed and did not...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal refuses to restore appeal dismissed for non-appearance
In Appeal No. AT006000000021456, the Maharashtra appellate tribunal rejected an application to restore an appeal after finding that the explanation for repeated non-appearance and the later restora...
Maharashtra appellate tribunal grants one-month stay to enable High Court challenge
In Misc. Applications 353, 354, 355 and 360 of 2023, the Maharashtra appellate tribunal stayed implementation of its 8 June 2023 common order for one month so the applicants could pursue a High Cou...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal removes two allottees from appeal after possession settlement
In Misc. Application No. 1085 of 2022, the Maharashtra appellate tribunal allowed two allottees to be removed from an appeal after possession-related settlements, rejecting one allottee's unsupport...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra tribunal allows interim possession pending payment reconciliation
The appellate tribunal treated possession as interim relief while leaving disputed balance-payment calculations to be reconciled before the appeal was finally decided
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA orders partner promoters to transfer project login credentials for RERA compliance
In Suo Motu Case No. 299 of 2023, MahaRERA directed partner promoters to ensure transfer and confirmation of project login credentials within two weeks so regulatory records could be updated
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA extends 16-building project registration to December 2026 with progress conditions
In Regulatory Case No. 25 of 2023, MahaRERA extended a 16-building project's registration to 31 December 2026 despite the absence of majority allottee consent, while imposing completion and monthly...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEUnderstanding the Execution of Warrants by Maharashtra Real Estate Regulatory Authority
Maharashtra Real Estate Regulatory Authority (MahaRERA) ensures effective execution of warrants for recovery of dues in the real estate sector. Learn more about this crucial development. #MahaRERA #RealEstateRegulation #HomebuyersProtection
Exclusion of Real Estate Projects from MahaRERA: A Detailed Overview
Learn about the recent circular issued by the Maharashtra Real Estate Regulatory Authority (MahaRERA) regarding the exclusion of certain real estate projects from MahaRERA registration. Find out how this impacts developers and homebuyers
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA extends project registration to December 2024 with monitoring conditions
In Regulatory Case No. 23 of 2023, MahaRERA extended the project, registration a registered project, to 31 December 2024 and imposed milestone, monthly-reporting and occupation-certificate conditions
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA extends project registration to December 2025
Regulatory Case No. 24 of 2023 extended the project registration to 31 December 2025 subject to completion and progress-reporting conditions
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA Implements Training and Certification Program for Real Estate Agents
Maharashtra Real Estate Regulatory Authority (#MahaRERA) introduces training and certification for real estate agents to promote professionalism and accountability in the industry. Read more about this landmark decision. #RealEstate #Professionalism
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA extends five-wing rehabilitation project to December 2026 with monitoring conditions
In Regulatory Case No. 17 of 2023, MahaRERA extended registration of a five-wing rehabilitation project to 31 December 2026 despite the absence of majority allottee consent, while imposing completi...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA extends project registration to June 2024 with monitoring conditions
In Regulatory Case No. 19 of 2023, MahaRERA extended project registration to 30 June 2024 and imposed completion and reporting conditions
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA extends project registration to June 2024
Regulatory Case No. 22 of 2023 extended the project, project a registered project, from 1 July 2023 to 30 June 2024 subject to completion conditions
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA extends project registration in Regulatory Case 14 of 2023
Regulatory Case No. 14 of 2023 extended the project registration from 31 December 2022 to 30 December 2025 subject to completion conditions.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA extends project registration in Regulatory Case 15 of 2023
Regulatory Case No. 15 of 2023 concerned an extension of a redevelopment project through 30 December 2023.
MahaRERA extends redevelopment project registration to June 2025 with monitoring conditions
In Regulatory Case No. 18 of 2023, MahaRERA extended a substantially completed redevelopment project's registration to 30 June 2025 despite the absence of majority allottee consent, while imposing...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA extends project registration to December 2026 after stop-work delay
MahaRERA considered Regulatory Case No. 16 of 2023 concerning the project, project registration a registered project.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA extends project registration in Regulatory Case 20 of 2023
Regulatory Case No. 20 of 2023 extended the project registration from 31 December 2022 to 30 December 2023 under Section 7(3), with completion and reporting conditions.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA extends project registration to June 2025
Regulatory Case No. 21 of 2023 concerned an extension of the project, MahaRERA project a registered project, to 30 June 2025
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA invites objections to deregistration requests for 88 projects
MahaRERA invited stakeholder objections to deregistration requests involving 88 registered projects, including projects affected by viability, approval and development issues.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra Real Estate Regulatory Authority Mandates QR Code Display in Real Estate Advertisements
Maharashtra Real Estate Regulatory Authority introduces QR codes for real estate advertisements, enhancing transparency and accessibility. #MahaRERA #RealEstate #Transparency
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal condones one-day delay and directs Section 43(5) deposit
In Appeal No. AT005000000144216, the Maharashtra appellate tribunal condoned a one-day filing delay without costs but required the promoter-appellant to comply with the statutory Section 43(5) pre-...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal confirms service and adjourns appeal for respondent appearance
In Appeal No. AT005000000134100, the Maharashtra appellate tribunal accepted proof that the respondent had been served and adjourned the matter to 25 April 2023 to allow further participation
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal grants time for additional-document application
In Appeal No. AT001000000031699, the Maharashtra appellate tribunal gave both sides additional time to file and exchange an application concerning documents not produced in the original RERA procee...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal grants time to file document-production applications
In Appeal No. AT001000000031698, the Maharashtra appellate tribunal gave the appellant until 17 April 2023 to file and serve applications concerning documents annexed to the appeal and adjourned th...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal treats appeal as timely after late receipt of ex-parte order
In Appeal No. AT006000000113940, the Maharashtra appellate tribunal accepted the appellant's explanation that the ex-parte order was received only in July 2022 and held that the appeal was not barr...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal upholds delayed-possession relief in Appeal AT006000000053548
A Reunion article describes Appeal No. AT006000000053548 before the Maharashtra Real Estate Appellate Tribunal as a delayed-possession dispute.
Maharashtra appellate tribunal grants time for service affidavit and adjourns appeal
In an appeal identified in the source as AT006000000073860, the Maharashtra appellate tribunal granted additional time to complete service on a non-applicant and adjourned the matter from 11 April...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEHigh Court stay pauses execution of Maharashtra appellate tribunal order
A High Court stay temporarily halted execution of a Maharashtra Real Estate Appellate Tribunal order in Appeal No. AT006000000010821 while the parties addressed compliance and the matter was adjourned
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra tribunal article reports allottee-status ruling with limited case detail
An article attributes a Maharashtra Real Estate Appellate Tribunal ruling to appeal ATOO6000000033903.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal considers consent for transposition of parties in RERA appeal
A Reunion article describes a procedural application before the Maharashtra Real Estate Appellate Tribunal concerning the proposed transposition of parties in a pending RERA appeal.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA Introduces New Guidelines for Promoters' Compliance in Real Estate Sector
Discover the latest guidelines by MahaRERA aimed at enhancing promoters' compliance in the real estate sector. Find out how these new regulations streamline processes and protect buyers' interests. #MahaRERA #RealEstateCompliance
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA Implements Verification System for Commencement and Occupation Certificates
Worried about the authenticity of real estate certificates? Worry no more! MahaRERA introduces a comprehensive verification process to ensure genuine commencement and occupation certificates. Your trust, our priority! #MahaRERA #VerifiedCertificates #TransparentRealEstate #TrustworthyInvestments
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal condones 27-day delay subject to Rs. 20,000 costs
In Appeal No. AT006000000134045, the Maharashtra appellate tribunal took a liberal approach to a disputed 27-day filing delay but made condonation conditional on payment of Rs. 20,000 costs to the...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal disposes appeal after Rs. 9 lakh settlement and possession
In Appeal No. AT006000000144243, the parties settled for Rs. 9 lakh together with possession of the subject flat, and the Maharashtra appellate tribunal disposed of the appeal by consent
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal disposes review after parties file consent terms
In proceedings connected with Appeal No. AT006000000053105 and Review Application No. 34 of 2022, the Maharashtra appellate tribunal disposed of the matter after the parties filed and confirmed con...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEConsumer article reports refund with 12% interest after project delay
A Reunion article reports a National Consumer Disputes Redressal Commission order concerning delayed delivery of residential flats.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra tribunal article records pending delay-condonation plea
A Reunion article describes a Maharashtra tribunal hearing concerning a request to condone delay in filing an appeal.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal closes non-compliance application after payment settlement
Misc. Application No. 496 of 2022 in Appeal No. AT006000000063820 was withdrawn after the amount due under the earlier order, including costs and delayed-payment interest, was paid and the applican...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal dismisses two possession appeals after settlement
Two Maharashtra RERA appeals were dismissed after the buyers and developer filed a joint pursis confirming payment of the balance consideration, delivery of possession and settlement of the dispute
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra tribunal adjourns matter to explore settlement
At an April 2023 hearing, the Maharashtra appellate tribunal adjourned a pending matter to July to allow time for a possible settlement.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal adjourns unattended appeal to final hearing
In Appeal No. AT006000000041928, no party appeared at the 26 April 2023 video-conference hearing, so the Maharashtra appellate tribunal adjourned the matter to 16 June 2023 for final hearing
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal allows rejoinders in two pending appeals
In two pending appeals, the Maharashtra appellate tribunal granted time for replies, rejoinders and written submissions ahead of final hearing
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal continues interim order and fixes final hearing
In two connected Maharashtra RERA appeals, the appellate tribunal continued an existing ad-interim order and fixed 7 June 2023 for final hearing after the parties confirmed that pleadings and writt...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal dismisses two appeals for want of prosecution
In Appeals No. AT006000000053212 and AT006000000053213, the Maharashtra appellate tribunal dismissed delay-condonation applications and the appeals themselves after repeated non-appearance by the a...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal recalls ex-parte order after video link was not received
In Misc. Application No. 204/2023, the Maharashtra appellate tribunal set aside an ex-parte order after accepting that the respondents had not received the video-conference link for the earlier hea...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal advances part-heard appeal for final hearing
In Appeal No. AT006000000133980, the Maharashtra appellate tribunal moved a part-heard matter forward to 3 May 2023 for final hearing after one side sought priority and the opposing arguing counsel...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra tribunal issues interim EMI-payment direction
At an April 2023 hearing, the Maharashtra appellate tribunal issued an interim direction concerning EMI payments under a tripartite arrangement.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal orders interim EMI recovery in tripartite housing dispute
An interim Maharashtra appellate order addressed who should continue servicing EMIs under a tripartite property-finance arrangement while related pleadings remained pending.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMREAT execution-jurisdiction article contains conflicting legal references
A May 2023 article reports dismissal of an execution application for lack of jurisdiction, but its title, statutory references and procedural account conflict and no case number is supplied
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal dismisses promoter appeals for Section 43(5) pre-deposit default in April 2023
The source reports that the Maharashtra Real Estate Appellate Tribunal dismissed two promoter appeals on 27 April 2023 for non-compliance with the statutory pre-deposit requirement in Section 43(5)...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal extends time for sale-agreement execution
In Execution Application No. 20 of 2021 in Appeal No. AT006000000010936, the tribunal granted more time and directed payment of Rs. 10,000 costs
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal dismisses possession appeal after settlement
A Maharashtra RERA appeal was dismissed on 4 May 2023 after the appellants confirmed that possession of the disputed flat had been delivered and the parties had settled their dispute
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal dismisses two promoter appeals for Section 43(5) pre-deposit non-compliance
The Maharashtra appellate tribunal dismissed two promoter appeals on 4 May 2023 after repeated failure to comply with the statutory pre-deposit requirement under the proviso to Section 43(5) of the...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal disposes appeal after settlement and withdrawal
A Maharashtra appellate tribunal proceeding ended after the appellant confirmed that the parties had settled and sought unconditional withdrawal of the appeal
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal returns execution application to MahaRERA
In Appeal No. AT006000000052360, the tribunal returned an execution application to MahaRERA as the proper forum for enforcing its earlier order
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEAn Introduction to Punjab RERA: What You Need to Know
Looking to stay compliant with Punjab RERA? Check out our comprehensive guide on everything you need to know about RERA Punjab! #PunjabRERA #RealEstateCompliance
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal dismisses appeal after unconditional withdrawal
A Maharashtra appellate tribunal order dated 3 May 2023 records unconditional withdrawal of an appeal and connected Miscellaneous Application No. 281 of 2022, ending the proceeding without a merits...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEArticle reports six-month MahaRERA extension without an order reference
A May 2023 article says a Goregaon residential project received a six-month MahaRERA extension because of pandemic-related delays, but supplies no registration, application, order number or new dea...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEPrimo extension article contains conflicting outcome and no regulatory reference
A May 2023 article about a Mumbai project extension request contradicts itself on whether relief was pending or partly granted and supplies no project registration, application or order number
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal disposes real-estate appeal after consent settlement
A Maharashtra appellate proceeding ended after the parties executed consent terms, confirmed the settlement before the tribunal and disposed of pending applications
Maharashtra appellate tribunal allows allottee to withdraw Rs. 7.77 lakh deposit
The Maharashtra appellate tribunal permitted an allottee to withdraw Rs. 7.77 lakh deposited with the tribunal after the opposing side raised no objection, while the wider proceeding remained liste...
Maharashtra appellate tribunal allows roznamas subject to admissibility in pending appeal
An article published in May 2023 reports an interim procedural order of the Maharashtra Real Estate Appellate Tribunal in a pending appeal.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal allows withdrawal of Rs. 3.67 lakh deposit under consent terms
In Misc. Application No. 1125 of 2022, the Maharashtra appellate tribunal permitted withdrawal of approximately Rs. 3,67,992 deposited under Section 43(5), relying on consent terms that allowed rel...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal modifies recovery warrant to Rs. 2.09 crore in payment dispute
A Reunion article describes a payment dispute before the Maharashtra Real Estate Appellate Tribunal in which a recovery amount was recalculated.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal records interim halt on construction pending appeal
At a 2 May 2023 hearing, the Maharashtra appellate tribunal recorded a party's undertaking to halt construction until the next hearing while the appeal remained pending
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA classification of proprietary concerns for fee purposes
A discussion of MahaRERA's reported treatment of proprietary concerns for fee purposes, including the implications described for real-estate agents.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal continues status-quo protection in property dispute
The Maharashtra Real Estate Appellate Tribunal continued existing ad-interim protection requiring the disputed property to remain in status quo and adjourned the matter for further hearing
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA Introduces New Procedure for Changing Designated Bank Accounts
MahaRERA introduces new procedure for changing designated bank accounts to boost transparency in real estate sector. #MahaRERA #RealEstate #Transparency
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra Real Estate Authority directs registered agents to submit half-yearly reports
Maharashtra Real Estate Authority directs registered agents to submit half-yearly reports. A move towards greater transparency and accountability in the real estate sector. #MahaRERA #RealEstate #Transparency #Accountability
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEArticle reports occupation-certificate delay with conflicting project details
A Reunion article reported that a residential project in the Mumbai region was facing delay in obtaining an occupation certificate.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA project-extension documentation proceeding
The source reports that MahaRERA directed submission of outstanding documents in an extension matter concerning the project.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal dismisses appeal for want of prosecution in April 2023
The source reports that the Maharashtra appellate tribunal dismissed an appeal on 13 April 2023 after no party appeared in either the morning or afternoon session
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA sets roadmap for implementation of real estate agent certification program
Maharashtra Real Estate Regulatory Authority (#MahaRERA) has set a roadmap for the implementation of a real estate agent certification program. Learn more about the benefits and consequences of non-compliance in our latest article. #realestate #certificationprogram
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEPune residential project seeks MahaRERA extension after construction delays
A Pune residential project sought a six-month MahaRERA extension after construction delays, according to the article.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMaharashtra appellate tribunal records Rs. 9 lakh settlement and possession terms
A Maharashtra appellate tribunal proceeding ended through consent terms after the buyer confirmed receipt of Rs. 9 lakh and the parties agreed on delivery of possession of the disputed flat
Maharashtra RERA Allows De-Registration of Real Estate Projects: What it Means for Builders and Homebuyers
Maharashtra RERA allows de-registration of real estate projects, giving relief to homebuyers. Learn how this decision impacts builders and buyers. #MaharashtraRERA #RealEstateNews #Homebuyers #Buil...
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMumbai residential project seeks registration extension after construction delays
A Mumbai residential project sought a registration extension after construction delays, according to the article.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMumbai residential project seeks six-month MahaRERA extension pending occupation certificate
A Mumbai residential project sought a six-month registration extension while its occupation certificate remained pending.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEDevelopers face allegations over false commencement certificates
The article describes allegations that developers submitted false commencement certificates in connection with real-estate approvals.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA issues show-cause notice over alleged false commencement certificate
MahaRERA reportedly initiated show-cause proceedings over an allegedly false commencement certificate.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEBasic Real Estate Agent Training and Certification Course Across Maharashtra
A basic training course for real estate agents. Get certified & improve your skills. #MahaRERA #RealEstateAgentTraining #CertificationCourse
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA imposes Rs. 50,000 penalty for advertisement registration-number omission
MahaRERA imposed a Rs. 50,000 penalty under Section 61 after a project advertisement omitted the required registration number
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA imposes Rs. 50,000 penalty in March 2023 Lokmat advertisement case
MahaRERA imposed a Rs. 50,000 penalty after a March 2023 Lokmat advertisement omitted project registration numbers, with a further Rs. 1,000-per-day consequence for non-payment
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMumbai promoters investigated over alleged false commencement certificates
Mumbai real-estate promoters reportedly faced municipal and regulatory scrutiny over allegedly false commencement certificates.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA imposes Rs. 25,000 advertising penalty for missing registration number
A 2023 MahaRERA suo motu matter resulted in a Rs. 25,000 penalty for an advertisement that omitted the project registration number
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA imposes Rs. 50,000 penalty for advertisement missing registration number
MahaRERA imposed a Rs. 50,000 penalty after a March 2023 advertisement omitted the project registration number.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA extension article records order reserved
A 2023 Reunion article reports that MahaRERA reserved its decision on a project-extension request after an April 2023 hearing, but provides no case number or final order
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA tightens scrutiny of commencement certificates
MahaRERA reportedly strengthened verification and enforcement scrutiny concerning false or invalid commencement certificates.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA imposes Rs. 1.5 lakh advertising penalty
A MahaRERA proceeding concerned Nashik project advertisements that omitted the required registration number.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA imposes Rs. 50,000 advertising penalty
MahaRERA imposed a Rs. 50,000 penalty after an advertisement omitted the required project registration number.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA imposes Rs. 2 lakh advertising penalty
An advertising-enforcement matter described in the article resulted in a Rs. 2 lakh MahaRERA penalty.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA project registration-extension proceeding
An article describes the project as the subject of a request to revive or extend a lapsed MahaRERA registration.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA Case 15 of 2023: Rs. 25,000 advertising penalty
MahaRERA Case No. 15 of 2023 imposed a Rs. 25,000 penalty after an advertisement did not prominently display the project registration number
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA imposes Rs. 50,000 penalty in Advertisement Case No. 14 of 2023
In Suo Motu Advertisement Case No. 14 of 2023, MahaRERA imposed a Rs. 50,000 penalty after an advertisement omitted the project registration number
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVE2023 MahaRERA compliance report notes notices to 16,000 projects
An article published in April 2023 reported on MahaRERA's compliance-monitoring push.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEMahaRERA action over allegedly forged project certificates
A MahaRERA enforcement matter concerned allegations that certificates submitted for a real-estate project had been forged.
The Importance of MAHARERA: Benefits for Homebuyers and Builders in Maharashtra
Learn about the benefits of MAHARERA for homebuyers and builders in Maharashtra. Find out how this act is important in the real estate industry.
Don't Make These Common Mistakes During the MAHARERA Registration Process!
In this article, we discuss common mistakes to avoid during the MAHARERA registration process. Learn about the importance of compliance, penalties for non-compliance, and how to file complaints wit...
How Long is MAHARERA Registration Valid For? How can you renew it?
One question that frequently arises among those registered with MAHARERA is how long their registration is valid for. In this article, we'll explore the answer to this question in-depth and provide...
Understanding the MAHARERA Registration Process: A Comprehensive Guide
The blog discusses the Maharashtra Real Estate Regulatory Authority (MAHARERA) registration process for real estate developers and agents in Maharashtra, India.
REUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVEUnderstanding Suo Motu Cases in MAHARERA: A Comprehensive Guide
MAHARERA is a regulatory body that protects homebuyers in Maharashtra. Suo Motu cases are initiated by the regulatory authority itself to enforce regulations on non-compliant developers. Respond pr...
Explore the full archive.
Browse guides, project coverage, regulatory orders and consumer cases across the publication.