A mixed residential and commercial project in Borivali West, Mumbai received MahaRERA approval on 18 November 2022 and is planned for completion on 30 September 2025. The developer had completed mixed-use residential and commercial development in Borivali before this project.
Technical Details
The project comprises one approved wing on a project area of about 1219 sq mts. The sanctioned plan records no recreational open space. Sanctioned build-up area was 3946.96 sq mts from total permissible build-up area of 3950.46 sq mts. The project plan had municipal approval.
Building details as per MahaRERA for the project
According to RERA, the project has received approval for 17 floors, one plith, and one slit. There are three podiums and one closed parking lot. The developer proposed a total of 55 covered parking spaces. The project has ten shops with carpet areas ranging from 32.92 to 59.08 sqmts, seven 2BHKs with carpet areas ranging from 70.05 to 70.80 sqmts, and eleven 3BHKs with carpet area as 99.15 sqmts.
The data listed below includes a breakdown of each unit:-
| Sr.No. | Apartment Type | Carpet Area (in Sqmts) | Number of Apartment |
|---|---|---|---|
| 1 | Shop | 59.08 | 1 |
| 2 | Shop | 38.34 | 1 |
| 3 | Shop | 45.41 | 1 |
| 4 | 3BHK | 99.15 | 11 |
| 5 | 2BHK | 70.05 | 5 |
| 6 | 2BHK | 70.80 | 2 |
| 7 | Shop | 56.16 | 1 |
| 8 | Shop | 32.92 | 1 |
| 9 | Shop | 38.82 | 1 |
| 10 | Shop | 32.92 | 1 |
| 11 | Shop | 44.56 | 1 |
| 12 | Shop | 51.39 | 1 |
| 13 | Shop | 38.82 | 1 |
Current work status of the project as per MahaRERA
80% of the excavation work has been completed, 74% of the work related to basement and plinths have been completed and 30 percent of the work related to stair case, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks has been completed. Work related to the external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing, Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate is yet to be completed as per the information on MahaRERA on 18th of November 2022.
Project team
The project team includes architecture, engineering and accountancy professionals.