A commercial project in Kulkarni Garden, Nashik was approved by MahaRERA on 29 November 2022. The planned completion date recorded in the project information is 31 December 2025.
Location Insights:-
Nashik is a historically holy city in the Indian state of Maharashtra.It is well-known for its similarities to the poetry "Ramayana." Panchavati is a temple complex on the Godavari River.
The traffic situation is good, the distance to drive for work or study is short, the weather is nice, and the municipal condition is decent. Despite growing levels of pollution, it is a far cleaner metropolis than many others.
Developer
The project is being developed by a real-estate developer.
Land arrangement
The project site is associated with a co-operative housing society under a development arrangement.
Technical details as per MahaRERA for the project:-
The project site is in Kulkarni Garden, Nashik.
The total number of wings suggested by the developer in the layout/plots is one, and they have gained approval for that one wing, which was applied for MahaRERA Registration. The MCGM has not yet been approved. The total project/plot area is around 2323.57 sqmts.
According to MahaRERA's authorised projects list, there is no provision for recreational open space. The plot's total permissible build-up area is about 3083.21 sqmts, while the total area sanctioned for building under MahaRERA is also 3083.21 sqmts.
Building details of the project:-
According to RERA, the project has received approval for 8 floors, and one plinth. There is no podium available and 134 open parking lots. The developer proposed a total of 104 covered parking spaces.
the project solely has business areas. The building has retail and office spaces with various carpet surfaces. The carpet area for stores ranges from (90.64 - 143.54 sqmts) while the carpet area for offices ranges from (32.46 - 88.03sqmts)
The information provided below contains specific details on the project units approved by MahaRERA:-
| Sr.No. | Apartment Type | Carpet Area (inSqmts) | Number of Apartment | Total |
|---|---|---|---|---|
| 1 | Shop | 90.64 | 1 | 90.64 |
| 2 | Shop | 143.54 | 1 | 143.54 |
| 3 | Office space | 32.46 | 6 | 194.76 |
| 4 | Office space | 33.79 | 6 | 202.74 |
| 5 | Office space | 34.33 | 1 | 34.33 |
| 6 | Office space | 36.58 | 7 | 256.06 |
| 7 | Office space | 36.9 | 6 | 221.4 |
| 8 | Office space | 41.47 | 7 | 290.29 |
| 9 | Shop | 130.07 | 1 | 130.07 |
| 10 | Office space | 64.16 | 6 | 384.96 |
| 11 | Office space | 64.88 | 1 | 64.88 |
| 12 | Office space | 88.03 | 1 | 88.03 |
Current work status of the project as per MahaRERA:-
The project work has not been started yet as per RERA Updates.
Facilities and amenities:-
The project includes amenities such as Water Conservation, Energy management, Electrical Meter Room, Sub-Station, Receiving Station, Open Parking, Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Landscaping & Tree Planting and street lighting.
Project team
The project team includes architecture, engineering and accountancy professionals.
Litigation Details:-
There are currently no litigation records in this project.


