InsightsPune
Pune / REUNION INSIGHTS

Commercial development in Pune

A commercial development in Pune with one sanctioned building, recreational open space, project amenities and planned completion in December 2026.

Commercial development in PuneREUNION / INSIGHTSCLARITY / CONTEXT / PERSPECTIVE
Reunion Insights editorial image

Project Overview

A commercial development in Pune is planned for completion on 31 December 2026.

Location Insights:

the project is located in the locality of Mohammadwadi in Pune, Maharashtra. Pune is a city located in the western Indian state of Maharashtra and is known for its cultural, historical, and educational significance. It is the second largest city in the state and is a major hub for information technology, manufacturing, and automobile industries.

The city is also home to several educational institutions, making it a popular destination for students. Mohammadwadi is a residential and commercial area located in the western part of Pune. It is well-connected to other parts of the city through a network of roads and public transportation. The area has a mix of residential, commercial, and industrial MahaRERA registered projects and is home to a number of schools, hospitals, and other amenities.

Developer

The project is being developed by a real-estate company.

Land arrangement

The project site is subject to a revenue-share arrangement with a private landholder.

Technical Details

The project site is in Pune. It comprises one sanctioned building with total FSI of 7625.46 sq mts and 1230 sq mts of recreational open space.

Building Details:

The single commercial building is spread on a total plot area of 4027 square meters and has a total of 15 floors, including 1 plinth, 1 podium, and 1 stilt. The building also has a total of 10 basements and offers 1400 covered parking spaces.

This RERA approved project offers a range of Office spaces with the carpet area ranging from  19.12 to 70.20 sqmts.

The details of units and their carpet area is mentioned below: -

Sr.No.Apartment TypeCarpet Area (in Sqmts)Number of Apartment
1Retail29.451
2Retail29.561
3Retail30.141
4Retail16.7018
5Retail17.004
6Retail26.463
7Retail29.271
8Retail19.271
9Retail19.471
10Retail23.381
11Retail23.491
12Retail25.9012
13Retail26.305
14Retail25.801
15Retail25.8812
16Office22.2230
17Office22.676
18Office25.553
19Office25.6739
20Office25.843
21Office26.129
22Office29.283
23Office29.803
24Office31.153

Facilities and Amenities:

They offer a range of facilities and amenities to ensure the comfort and convenience of residents. It includes internal roads and footpaths to facilitate the movement of people and vehicles within the development. Water conservation and rainwater harvesting systems have been implemented to ensure the sustainable use of resources.

Energy management measures have been put in place to ensure efficient use of electricity. The development meets fire protection and fire safety requirements and has an electrical meter room, substation, and receiving station to ensure the reliable supply of power. It also has an aggregate area of recreational open space for the enjoyment of residents.

There is open parking available in the project and a water supply system has been installed to ensure the availability of clean and safe drinking water. A sewerage system comprising chambers, lines, septic tanks, and a sewage treatment plant (STP) has been set up to manage the collection, treatment, and disposal of sewage and sullage water.

Storm water drains have been constructed to prevent flooding and protect the development from water damage. Landscaping and tree planting have been carried out to enhance the aesthetic appeal and provide a green environment. Street lighting has been provided to ensure the safety and security of residents.

Community buildings such as clubs, sports facilities, and other social amenities are available for the use of residents. Solid waste management and disposal systems have been set up to ensure the proper and responsible handling of waste materials.

Project team

The project team includes architecture, engineering and accountancy professionals.

Litigation Status:

the project has been the subject of two lawsuits. The first lawsuit was filed in the Chief Judicial Magistrate Court in Pune in 2014 and is classified as a criminal case with a case number of 898. The case is ongoing and no preventive/injunction/interim order has been passed. The petition in this case is referred to as a "private criminal complaint" and the current status is listed as "hearing."

The second lawsuit involving the project was filed in the Civil Judge Sr Div Court in Pune in 2020 and is classified as a civil case with a case number of 279. This case is also ongoing and no preventive/injunction/interim order has been passed. The petition in this case is referred to as a "suit" and no further details are provided.

R
Reunion Insights

Research, explainers and perspectives.

CONTINUE READING

More from Reunion Insights